ACI SP-332 PDF
Original price was: $70.00.$35.00Current price is: $35.00.
Responsibility in Repair Construction
American Concrete Institute , 08/01/2019
File Format: PDF
- Description
Description
ACI SP-332 PDF
The responsibilities for parties involved in a repair project may be significantly different than those traditionally encountered in new concrete construction. The new ACI 562 Code Requirements for Assessment, Repair and Rehabilitation of Concrete Buildings and corresponding ACI 563 Specifications for Repair of Concrete in Buildings identify requirements for the Licensed Design Professional and the contractor’s Specialty Engineer during repair programs. Differing lines of authority in repair are presented through industry practice recommendations and case studies, along with identification of industry needs, informing parties engaged in concrete evaluation and repair projects.